Time for sheet rock installation. Photos by Josie Hannes Design.
- Electrical fixtures go in
- Mar 28. Finishing touches on the courtroom ceiling
- Finishing up
- Sheet-rocking the Assessor’s Office
- Restoring the look of the courtroom ceiling
- Sheet-rocking begins on the courtroom walls
- Tall ceilings require climbing
- Scaffolding helps
- Supplies go in one window on a lift (behind the chute), trash comes down the chute, and electrical service goes through the exterior pipe up to the attic. A trim piece, painted to blend in, will cover the pipe