- The roof was re-shingled a few years ago, so it no longer leaks
- The attic. Note the original combination of a wood and metal framework
- New electrical service was brought up into the attic from the outside conduit, then wiring was dropped into the renovated areas
- More plans
- Richard Reed, County Supervisor, studies the floor plan
- Floor plan. North is to the left
- Stairway post
- Blueprints for the renovation/remodeling
- A view of the main entrance of the new courtroom lobby (from within the lobby – south wall). The third floor section will be built just above the doors
- North wall. The temporary stairs allow materials to enter through the window opening
- South wall
- West wall after the false ceiling was removed, Jan 25, 2010
- Old heating device found in the wall
- Courtroom
- More stencilling
- Door knob
- The original doors will be saved and refinished
- Original stencilling found behind paneling
- East wall of the courtroom lobby. These stairs begin the “back” stairway system to the third floor